The fillets are in and a layer of 10 oz glass has been applied to the bottom. The bulkhead faces already have a layer of 4oz. The interior sides will each get a layer of 4 oz and the a layer of tape will finish the joints.
Sunday, April 1, 2007
Fillets & Glassing
Getting ready to apply epoxy fillets to the main cabin. The fillets are masked off since I am thinking of leaving the salon bright (natural wood). Masking the the fillets helps make a tidy job.

The fillets are in and a layer of 10 oz glass has been applied to the bottom. The bulkhead faces already have a layer of 4oz. The interior sides will each get a layer of 4 oz and the a layer of tape will finish the joints.
The fillets are in and a layer of 10 oz glass has been applied to the bottom. The bulkhead faces already have a layer of 4oz. The interior sides will each get a layer of 4 oz and the a layer of tape will finish the joints.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment