
Here what they look like from below. (Sorry photo is sideways!) (Deck beam on the left, sheer batten at top, carlin bottom.)
Construction of a prototype Enigma 460, designed by Matt Layden.

Overhead view. The bracing was used to spread the house sides and the front and back to fit the deck. Still have to fit the side deck carlins now that the shape is established.





A temporary template was made to hold the bolts in place while the outer ring is filled with thickened epoxy. Mold release is used to keep the template from adhering to the template.
Bolts epoxied into the outer ring. The epoxy makes the ring much more rigid, too.

The hatch in place with screw-in cover.
The blocking at the deck beam is for the mast partner, and the blocking at the bulkhead is the backing for the foredeck cleat. It's been a little weird putting all this together without permanent fastners, but I am getting the hang of it. Not a single permanent fastner in the boat so far. Temporary screws (and the wires of course) make good clamps occasionally.



