Right side up and the cutouts for the bulkhead hatches are made. Temporary forms are back in to keep the hull tweaked to the correct shape until the deck is on.
Cutting out the house. House sides shown here. Windows will be cut out after the house is assembled and taped. I want to get the house tacked together for reference as I lay out the deck framing.
Thursday, May 3, 2007
Subscribe to:
Posts (Atom)